INSTALLATION
- Pattern mosaic tiling to entire Level 1 floor, staircase, WC walls and bar walls
- Notch trowel finish to WC walls
- Terrazzo tiling to bar tops and fronts, stair and entrance walls and table tops
- Terrazzo polishing of external corners insitu
- Penetrative terrazzo sealer
- Total tiling of 278m2
SUBSTRATE PREPARATION
- Waterproofing membrane
- Quartz priming